A steel rolling line in a hall at dusk: a white-hot bar runs along yellow roller stands from the furnace at the left, a worker in a hard hat at the left edge and another walking behind, a hoist hook and a red cabinet on the blue steelwork, the first frame of a looping stock film

From every stop to the fix.

Albini Groundtruth reads stops, changeovers and starved stations, checks them against your schedule, and turns each gap into a fix.

Reads the lineChecks your MES planProposes the fix

Factories

84%

of manufacturers can't see work in progress across the whole process in real time.

The problem

The line knows more than the report.

Stops, waits and changeovers happen between the bookings.

Zebra Technologies, Manufacturing Vision Study 2024, 1,200 leaders (vendor-commissioned).

Events · proposed

The line tells you before the report does.

Your MES records what was booked. Groundtruth sees the stop nobody logs, then proposes the fix.

Looking down an automated cell: two pink boards on a carriage between white machine frames, blue rollers in the foreground, nobody in the frame, stock footage with an illustration of event lines and boxes
  1. 10:02:10 · Line 2 · Stopped
  2. 10:41:30 · Line 2 · Stopped
  3. 11:20:00 · Station 3 · Starved
  4. 11:22:40 · Cell 4 · Tugger waiting
Exampleline.stopped

Line 2 has stopped three times since 10:00.

Tell maintenance before the fourth, with the three stop times in hand.

Examplechangeover.long

Line 1 is past its changeover slot.

Stage the next order's material now, before the delay reaches the order behind.

Exampletugger.waiting

A tugger waits at Cell 4 while Station 3 is starved.

Send the tugger to Station 3, before the line has to slow.

The screen

One screen, from stop to fix.

Pace against plan, and the move that fixes the gap.

01

Deadlines

Next hand-off against its time.

02

Output

Made against plan.

03

Processes

Rate and people, worst first.

04

People

Crew against need.

05

Backlog

Work waiting, time left.

What it needs

Your cameras. Your MES. You approve the change.

A close view of an angle grinder cutting a bar held in a vice, a gloved hand at the top right and a spray of sparks, stock footage
01

The cameras you already have

Added only where there is a blind spot.

02

Your MES or ERP, as the plan

Read first: the schedule is the yardstick.

03

Counts, not people

Down to a cell, no names.

Our team has built operations and technology at

See what Groundtruth would catch, and fix, on your site.